
Major Internal Maintenance of GST6 at Sitra DFS, GST1 at HTDS, GST7 & ESR at HTBS & GST2 at Hamala A2 BS

1200mm Diameter Process Piping Works at Al Dur FS

Pumping Station Works at Al Dur FS

Surge Vessel Installation Works at Al Dur FS

20 MG Capacity Above Ground Storage Tank at Al Dur FS

Construction of 1200mm Diameter Above Ground & Underground Water Transmission Pipeline Including Concrete Chambers % Highway Road Crossings

Water Stations at Hidd Lot A, Hidd FS, SKBS DS & Connection Works at Hidd BS & Samaheej BS Construction of 2 Nos. 5 MG Above Ground Storage Tanks and Pumping Station

Diyar Al Muharraq Water Transmission Scheme Construction of 5 MG Above Ground Storage Tanks & 1 MG ESR & Pumping Station

Fabrication & Installation of a Heavy Steel Structure for the Link Bridge at ABC Bank in Manama

Construction of 1000mm, 800mm & 600mm Diameter Below Ground Water Transmission Pipeline Including 150mm Telemetric Duct & Associated Chambers, Thrust Blocks, Cable Draw Pits, Non Disruptive Road Crossings (NDRC) & Open Cut Road Crossings

Pipeline Works

Provision of Manpower Services for Installation of Onshore Bahrain Pipeline Project

East Pipeline Installation

Hidd Water Station

Water Distribution Station

Hidd Pipeline Installation

Water Transmission Pipelines Supply and Installation

Ground Storage Tanks for Water

Pipeline Installation Works

Ground Storage Tanks for Water

Elevated Water Station Service Reservoirs

New Al Dur FS Storage Tank and Modification Works at West Riffa BS and Refinery DS

Construction of 1000 mm Diameter Transmission Pipeline from WRBS to HRBS

Pumping Station Works: West Riffa BS, Hamad Town BS, Al Areen, Samahij BS, Al Dur FS and Refinery DS

Construction of 9 Ground Storage Tanks at Al Dur

Construction of 2 Units 10 MG Elevated Storage Reservoirs at Tubli DS & Buquwah DS

Construction of Ground Storage Tanks 2 Units of 10 MG at Buquwah DS & 5 Units of 54 MG GST’s at Various Stations

5 Units of 20 MG Ground Storage Tanks at Hidd FS & Salmabad FS

Construction of 4 Inch Diameter Gas Pipeline & Associated Facilities for Cement Plant

Construction of a New 12 Inch Diameter Gas Pipeline Replacement on the Sitra Bridge Project

Construction of 600mm Diameter Water Pipeline at Durrat Al Bahrain

Sewage Line Replacement at the Sitra Bridge Project

Facelift/Upgrade of Sitra, Riffa & Tubli Service Stations

Gas Dehydration Unit (GDU) Installation of Skids & Interconnecting Piping
© Copyright 2025 | Panorama Contracting & Engineering Services W.L.L.