Diyar Al Muharraq Water Transmission Scheme
Construction of 5 MG Above Ground Storage Tanks & 1 MG ESR & Pumping Station
Category: Timeline Stories
All timeline stories.
Electricity & Water Authority
Water Stations at Hidd Lot A, Hidd FS, SKBS DS & Connection Works at Hidd BS & Samaheej BS
Construction of 2 Nos. 5 MG Above Ground Storage Tanks and Pumping Station
Electricity & Water Authority
20 MG Capacity Above Ground Storage Tank at Al Dur FS
Electricity & Water Authority
1200mm Diameter Process Piping Works at Al Dur FS
Electricity & Water Authority
Pumping Station Works at Al Dur FS
Electricity & Water Authority
Surge Vessel Installation Works at Al Dur FS
Electricity & Water Authority-Water Transmission Directorate
Major Internal Maintenance of GST6 at Sitra DFS, GST1 at HTDS, GST7 & ESR at HTBS and GST2 at Hamala A2 BS
Electricity & Water Authority
Construction of 1200mm Diameter Above Ground and Underground Water Transmission Pipeline Including Concrete Chambers and Highway Road Crossings
ABC Bank Refurbishment Works
Fabrication and installation of a heavy steel structure for the link bridge at ABC Bank in Manama.
Electricity & Water Authority
- Pipeline Hidd Installation Works
- Construction of 1000mm, 800mm & 600mm Diameter Below Ground Water Transmission Pipeline Including 150mm Telemetric Duct & Associated Chambers, Thrust blocks, Cable Draw Pits, Non Disruptive Road Crossings (NDRC) & Open Cut Road Crossings