Diyar Al Muharraq Water Transmission Scheme
Construction of 5 MG Above Ground Storage Tanks and 1 MG ESR and Pumping Station
Category: Timeline Stories
All timeline stories.
Electricity & Water Authority
Water Stations at Hidd Lot A, Hidd FS, SKBS DS and Connection Works at Hidd BS and Samaheej BS
Construction of 2 Nos. 5 MG Above Ground Storage Tanks and Pumping Station
Electricity & Water Authority
20 MG Capacity Above Ground Storage Tank at Al Dur FS
Electricity & Water Authority
1200 Diameter Process Piping Works at Al Dur FS
Electricity & Water Authority
Pumping Station Works at Al Dur FS
Electricity & Water Authority
Surge Vessel Installation Works at Al Dur FS
Electricity & Water Authority-Water Transmission Directorate
Major Internal Maintenance of GST6 at Sitra DFS, GST1 at HTDS, GST7 and ESR at HTBS and GST2 at Hamala A2 BS
Electricity & Water Authority
Construction of 1200 Diameter Above Ground and Underground Water Transmission Pipeline Including Concrete Chambers and Highway Road Crossings
ABC Bank Refurbishment Works
Fabrication and Installation of Heavy Steel Structure of Link Bridge at ABC Bank, Manama
Electricity & Water Authority
- Pipeline Hidd Installation Works
- Construction of 1000, 800 and 600 Diameter Below Ground Water Transmission Pipeline Including 150 mm Telemetric Duct and Associated Chambers, Thrust blocks, Cable Draw Pits, Non Disruptive Road Crossings (NDRC) and Open Cut Road Crossings